This blog follows the progress of the LRO mission through Integration and Testing at NASA's Goddard Space Flight Center and launch site processing at KSC\Astrotech. Its purpose is to enable communication to the entire LRO Team about the status of ongoing activities.

LRO was launched June 18th, 2009 at 5:32pm EDT from KSC. This BLOG will follow the progress of the mission as LRO travels to the Moon and establishes orbit around it.

This BLOG will be periodically updated during LRO's early mission but as the nominal mission unfolds the official NASA LRO website and the LRO Science Instrument's own websites will evolve into a more interesting sources of LRO science results as postings appear there first and LRO engineering and operations (source of this site) will become increasingly routine.




Friday, October 9, 2009

LRO Observes LCROSS Impact!

LRO Status
LRO continues to operate as planned in the 50 km nominal mission orbit post MOI with no significant open issues or problems.

In addition this week LRO operations were focused on supporting the LCROSS lunar impact today. Earlier in the week LRO adjusted its orbit to prepare to observe the impact ejecta plume. The necessary maneuvers were practiced throughout the week and LRO successfully observed the impact plume after the LCROSS impact. LRO was rolled 81 degrees to view the plume at LRO’s closest approach (76.5 km to impact site). The LAMP instrument (UV spectrometer) has already confirmed detection of the ejecta plume and has begun analyzing the their data. The Diviner instrument (Imaging Radiometer) has confirmed they have detected the LCROSS impact crater.

Congratulations to our sister mission!!

Tuesday, September 15, 2009

LRO Mission Orbit Insertion Completed!

Today at 3:32pm ET today LRO executed a 3 minute propulsion burn near the periselene of our last commissioning phase orbit. This placed LRO in a 50 km (mean) circular polar orbit about the Moon. With this maneuver LRO has begun its primary 1 year Exploration mission.

Below is a paste of the NASA Media Advisory announcing the upcoming LRO First Light press conference this Thursday.

MEDIA ADVISORY: M09-174

NASA TO RELEASE FIRST RESULTS FROM LUNAR MISSION THURSDAY, SEPT. 17

GREENBELT, Md. -- NASA will showcase new images from the Lunar Reconnaissance Orbiter's seven instruments and provide updates about the topography of the moon's south pole during a news conference at 1 p.m. EDT Thursday, Sept. 17. NASA also will provide an update about the spacecraft's status and mission plans. The briefing will take place at NASA's Goddard Space Flight Center in Greenbelt, Md., and will be broadcast live on NASA Television and the agency's Web site.

Panelists are:
-- Craig Tooley, Lunar Reconnaissance Orbiter project manager, Goddard Space Flight Center
-- Michael Wargo, chief lunar scientist, Exploration Systems Mission Directorate, NASA Headquarters, Washington
-- Richard Vondrak, Lunar Reconnaissance Orbiter project scientist, Goddard
-- David Smith, Lunar Orbiter Laser Altimeter principal investigator, Goddard

To RSVP or to participate by telephone, reporters should contact Rani Gran at 301-286-2483 by noon Sept. 17.

Reporters attending the event at Goddard should sign in at the center's main gate by 12:30 p.m. Thursday. The gate is located at 8800 Greenbelt Rd. in Greenbelt. NASA representatives will be available to escort reporters from the gate to the event.

For NASA TV streaming video, downlink and scheduling information,
visit:

http://www.nasa.gov/ntv

Thursday, September 10, 2009

LRO Completion of Commissioning

A review was held yesterday, September 9th, during which it was verified LRO is ready to proceed to the 50km polar mapping orbit and begin the prime mission. On September 15th LRO will execute the Mission Orbit Insertion (MOI) propulsive maneuver and establish the nominal mission orbit. LRO is ready to begin the prime mission, the spacecraft, the instruments, and the ground system are performing flawlessly!

Upcoming next week NASA will hold a "First Light" LRO press conference. Watch for the NASA media advisory which will have the details. Once announced it will also be posted here.

LRO is also preparing to support the LCROSS impact on October 9th, having already providing observations and data to aid in the final LCROSS target selection.

Wednesday, August 26, 2009

LRO Videos Available

Aloha LRO Team and Fans – now posted to the Goddard Multimedia website are 11 videos, various views of the LRO/LCROSS launch, in several different formats for your viewing pleasure 

Also posted is brand new footage of the LRO Project Team at GSFC’s Mission Operations Center (MOC) and Launch Support Room (LSR) before, during, and post launch on June 18th….you all totally ROCKED!!

Check them all out at: http://svs.gsfc.nasa.gov/vis/a010000/a010400/a010469/

Wednesday, August 19, 2009

LRO to Perform Bi-Static Radar Experiment with Chandrayaan-1

On Aug. 20, 2009 NASA and the Indian Space Research Organization (ISRO) will attempt a novel joint experiment that could yield more information on whether ice exists in a permanently shadowed crater near the north pole of the moon. Currently the ISRO’s Chandrayaan-1 and NASA’s Lunar Reconnaissance Orbiter (LRO) spacecraft are orbiting the moon. While LRO is in its commissioning phase the two spacecraft pass close enough to each other when they are over the lunar north pole to attempt a unique experiment. Both spacecraft are equipped with a NASA Miniature Radio Frequency (RF) instrument that functions as a Synthetic Aperture Radar (SAR), known as Mini-SAR on Chandrayaan-1 and Mini-RF on LRO. The experiment uses both radars to point at Erlanger Crater at the same time.

Normally the Mini-RF Instrument sends radio pulses to the moon and precisely records the radio echoes that bounce straight back from the surface, along with their timing and frequency. From these data scientists can build images of the moon that not only show areas they otherwise couldn’t see, such as the permanently-shadowed areas near the lunar poles, but also contain information on the physical nature of the surface.
For the Bi-Static experiment the Mini-SAR on Chandrayaan-1 performs its normal SAR imaging (transmitting and receiving) while the Mini-RF is set to receive only. The two instruments look at the same location from different angles. Comparing the signal that bounces straight back to Chandrayaan with the signal that bounces at a slight angle to LRO provides unique information about the surface.

While this coordination sounds easy, this experiment is extremely challenging because both spacecraft are traveling at about 1.6 km per second and will be looking at an area on the ground about 18 km across. Due to the extreme speeds and the small point of interest, NASA and ISRO need to obtain and share information about the location and pointing of both spacecraft. The Bi-Static experiment requires extensive tracking by ground stations of NASA’s Deep Space Network, the Applied Physics Laboratory, and ISRO. In addition LRO will perform a 23 second propulsion burn today to adjust LRO orbit phasing to enable the coordinated observations.

The Mini-RF website will be the place to look for the first results of this experiment. The event is illustrated in the simulation below.


Friday, August 14, 2009

LRO Status

The LRO mission is now well past the halfway point of our commissioning phase during which we have been calibrating and testing the instruments. We now plan to lower our orbit down to the 50 km polar orbit on September 15th, 2009 and start the nominal mission.

Wednesday, August 5, 2009

We're at the Moon Event Video compilation


Aloha LRO Fans – Check out this awesome video compilation from Saturday’s “We’re at the Moon” Event:

http://svs.gsfc.nasa.gov/vis/a010000/a010400/a010475/index.html

Many thanks to Andy Freeberg for being videographer extraordinaire!!

Enjoy,
Cathy

Monday, August 3, 2009

An Awesome Weekend for LRO



Above photo is of Fans of LRO lining up to get a glimpse of the Moon and maybe LRO!

Aloha LRO Team! Congratulations to all of us for a totally awesomely successful weekend!


On Saturday night, the “We’re at the Moon” event held at the Goddard Visitor Center was a smashing success!! Many folks came out to celebrate with us and enjoy the LRO Project’s phenomenal success thus far. A Very Special Thank You to our Event Volunteers: Carmel Conaty, Trusilla Steele, Michelle Jones, Lora Bleacher, Heather Weir, Steph Stockman, Frank Ireton, Ron Zellar, Cindy Taylor, Rich Vondrak, Paul Lowman, Mark Beckman, Jan Mcgarry, Leigh Janes, Oscar Hsu, Rick Saylor, Maria Acevedo Rivera, and Nancy Neal Jones.


On Sunday, our LAMP instrument had its First Light. Congrats to our LAMP team!!


Rock on LRO!

Cathy


Monday, July 20, 2009

LRO Status July 18-19, 2009



Above STK images are of the start of the Star Cal and at target

LRO continues to perform very well in its commissioning orbit.

This weekend we performed LEND and LROC NAC Star Calibrations (see below STK images for the start of the Star Cal and at target). Data collection continues for all instruments, except for LAMP. LAMP Phase 2 will begin later this week.

Hope you all have seen and enjoyed LROC’s images of the Apollo Landing sites at: http://www.nasa.gov/mission_pages/LRO/main/index.html
Or
http://lroc.sese.asu.edu/index.html

Congratulations to our totally awesome LROC team for making history!! Congratulations to all on LRO!!

Cathy

Friday, July 17, 2009

Apollo Images from LRO!


At this site--> http://www.nasa.gov/mission_pages/LRO/multimedia/lroimages/apollosites.html The one above is Apollo 14

Congratulations to the LROC Team and the entire LRO Team for making this possible!

Tuesday, July 14, 2009

First Mini-RF Images!

The first images from Mini-RF, the synthetic aperture radar on LRO, is posted here: http://www.nasa.gov/mission_pages/Mini-RF/news/radar_tandem_searches.html

Monday, July 13, 2009

LRO Commisioning Orbit


For those interested in such things, LRO"s commissioning orbit remains very stable. The plot shows the phase-plot of the commissioning orbit for 90 days from the July 12th OD solution. The polar plot is Eccentricity (radial) vs Argument of Periapsis (angular). The orbit evolution remains bounded with AoP near 270 (periselene over south pole) and eccentricity is the neighborhood of 0.04. Eccentricity does very throughout each lunar cycle though.

LRO July 10-12 Status


The above STK image is of LRO on DOY 193

The LRO Spacecraft continues to perform nominally in its commissioning orbit.

On Friday, we updated the Safing tables and Safing RTSs as was planned prior to launch. Spacecraft ephemeris validation tables, ST and Gyro Cal tables were also uploaded.

With the Mini-RF data collection start on Sunday evening, all instruments have collected or are collecting data.

Thursday, July 9, 2009

LRO Status

LRO continues in her commissioning phase in the 30x199km commissioning polar orbit about the Moon. Today was a relatively quiet day for LRO with activities limited to some spacecraft housekeeping activities and the as-planned operation of Diviner, LROC WAC, CRaTER, and LEND in data collection/observation mode. Mini-RF is off at present, LAMP is powered but not observing, and LOLA is on but not lasing.

Tomorrow we plan to upload updates to the spacecraft Safing tables and RTSs. An activity always planned for this juncture in the mission. Saturday NAC imaging is again planned with our first off-nadir slews to perform the requested targeting.

Wednesday, July 8, 2009

7 and 7!!!


Above is the STK image of LRO on DOY 189

Today we completed LAMP Activation Phase 1a. The LAMP team reports that they are “happy.” We set DLRE temperature set points to their requested values, the DLRE team reports that they are “happy, happy.” We also activated Mini-RF and they are “happy” as well.

The LRO Spacecraft continues to make the Ops and Engineering Teams "happy" too :-)

As of July 8, 2009, LRO has successfully turned-on all 7 instruments in its Payload Complement: CRaTER, LEND, LROC, LOLA, LAMP, DLRE and Mini-RF!!

Congratulations everyone!!

Monday, July 6, 2009

LAMP Activation Begun

Today we began the LAMP activation sequence and Diviner has begun its nominal scanning sequence.

LRO is in Orbit #150.

Sunday, July 5, 2009

LRO's Great 4th of July Weekend


The above STK image is of LRO on DOY 186

LRO and it’s totally awesome team had a great 4th of July weekend!!

On July 4th, besides enjoying an awesome cookout at Building 32, we switched from Laser 1 to Laser 2 on LOLA and performed a HGA calibration.

On July 5th, we turned Diviner on, set LOLA to Flight Software Control, turned off Laser 2 on LOLA, and completed our last gyro calibration.

As of 12:50 pm EDT on July 5, 2009, LRO has 5 of its 7 instruments powered on - CRaTER, LEND, LROC, LOLA and DLRE. We are also on orbit 135 as of 3:30pm EDT.

Working hard for LRO,
Cathy and Rick

Saturday, July 4, 2009

LROC Lunar Flyover Video

For folks who have not yet figured out that the most spectacular LRO information is currently to be found at on the LROC website, go check out this LRO flyover video.

Friday, July 3, 2009

Instrument Commissioning Phase Begins!


The above STK image is of LRO on DOY 184.

Today we officially began our Instrument Commissioning Phase. We held our first Daily Planning Meeting with all Instrument Teams and Subsystem representatives. LROC was turned on and is currently taking images, while LOLA Laser 1 is lasing for 24 hours. Our plan is to switch to Laser 2 tomorrow and start DLRE activation on Sunday.


The LRO Spacecraft continues to perform extremely well in her commissioning orbit.

LOLA Successfully Ranging to the Moon!

The LOLA laser altimeter laser was turned on today at 1pm EDT and LOLA has reported the instrument is successfully performing ranging measurements to the lunar surface! LOLA will now begin its calibration activities. Activation of the Diviner (DLRE) instrument is planned for Sunday.