This BLOG will be periodically updated during LRO's early mission but as the nominal mission unfolds the official NASA LRO website and the LRO Science Instrument's own websites will evolve into a more interesting sources of LRO science results as postings appear there first and LRO engineering and operations (source of this site) will become increasingly routine.
Saturday, November 8, 2008
We have completed the following: Installation of the LVA cold ring,
installation of the Star Tracker Stimulus with heaters and thermocouples, installation LOLA shower head with heaters and thermocouples, but without the fiber optic cables; they will be installed on Monday, additional thermocouples were installed on the propulsion system cat bed heaters.
At this point we are still working on modifications to the Solar Array Gimbal thermal hardware; we are removing some blankets, installing Kapton tape on the harness and adding some heaters to the gimbal assembly. This activity will consume the remainder of the day. Other blanket work is going on in parallel to this task.
There is no work scheduled for tomorrow, Sunday 11/9/2008; we will resume chamber break activities on Monday morning, 11/9/2008.
Status 11/8 @9:30am
The SAS power harness has been secured to the enclosure by Brian.
Other things on the docket today include installing the LOLA GSE and opening up the blanket on the SAS gimbal and installing TCs.
Friday, November 7, 2008
Status 11/7 @10:30pm
Start of the LVA cold ring installation is 7am Saturday morning.
Status 11/7 @ 8:30pm
Still need to remove the test connector panel cover, test the pyro valve NSIs, safe to mate the battery GSE interface and install the test connectors.
Plan for Saturday.
- NO POWERED WORK.
We can’t work on the SAS gimbal and do testing at the same time. We will try to resume powered testing on Monday
- Install lower thruster covers. 7a
- Install LVA cold ring. 7a
- Install RF cable. 9a
- Install Star Tracker GSE. 8:30a
- Install LOLA GSE. 9a
- Install heaters & TCs on GSE. (after GSE installed)
- Work on SAS gimbal harness. 7a (all day)
- Install TCs near catbed heaters. (after cold ring installed)
Current Plans for tonight.
We started to backfill the chamber at 1:00 today. We should be ready to open the door around 4pm.
- 4pm -5p: Radiation Safety enters chamber to remove source/take sample & let us know we are clear to enter the chamber.
Door opening now estimated to be around 3pm.
Waiting to open the door.
Thursday, November 6, 2008
All Lro payload instruments have been powered off
Plan for tonight.
8am tag up in B7 Rm246 to go over the ToDo List. Use the normal meet-me telecon number if you can't make it.
Going Ambient!
TB-49, -50, -52, -53 all complete; waiting to transition to ambient temp
Wednesday, November 5, 2008
TB-47 RW Spin down complete
TBr2 Ka Band functional continues
We expect these activities to take at least 6 hours.
Thermal engineering has advised us that the #1 cold soak requirment has been fullfilled, therefore once we complete the remaing subsystem tests, we can prepare for the transition to ambient temperature and pressure TB55.
Half a league, half a league,
Half a league onward,
All in the valley of Death
Rode the six hundred.
"Forward, the Light Brigade!
"Charge for the guns!" he said:
Into the valley of Death
Rode the six hundred.
-Alfred lord Tennyson
R.Richardson
Afternoon Plans
2008 LRO Halloween Costume Contest Results

The results have been tabulated and checked by PwC....the Winner is.....
Adam Matuszeski as the Laser Ranger!!!
2nd place is Joanne Baker as LRO,
3rd Place is Tom Spitzer as ????,
4th Place is Brooke Hsu and Heather Weir as the Knights that go Nii!!
Congrats to all who entered, it was nice to see your true natures....
Stay tuned for our next contest during our Inferno Descent.
Correction: TB-45 Okay. Need to rerun the LROC Special Test.
Currently in TB-48 S-Band Testing
Plan is to finish the S-band test (about 12 noon) and then rerun the RWA Spin Down Test and parts of the LROC test in parallel.
“Computers have enabled people to make more mistakes faster than almost any invention in history, with the possible exception of tequila and hand guns”
LROC special testing and TB-45 complete
TB-44 Payload Functional - complete!
Tuesday, November 4, 2008
TB-44 still going
Look to the future because that's where you'll spend the rest of your life. George Burns (1896 - 1996)
TB-44 underway
Barbicane waited until half an hour had elapsed, which was more than enough to allow the instrument to fall to the level of the surrounding temperature.
From the Earth to the Moon, Jules Verne, 1865
Could Start Cold Soak around 2:30pm
11/04/08 1:45pm: Heading For Cold Soak in TB-42
Counting (schedule) chickens before they hatch
11/04 4:30 EST: TB-40 Orbiter Cold Start is complete!
T-Vac Status 1:05am 11.04.2008
ACS is now investigating and maintaining PR692.
Beyond the mountains there are mountains again - Haitian proverb
Monday, November 3, 2008
TB-40 is about 2 hours behind
Propulsion Cold Fire Test Ongoing
Internet Explorer Issue Fixed
Problem if you use Internet Explorer
T-Vac Status - 11/3/08 @ 11:00am
At that time, we will move onto TB-37 and TB-38 which will configure for and perform the propulsion cold fire test. TB-37 & TB-38 is expected to take ~5 hrs
Without change, something sleeps inside us, and seldom awakens. The sleeper must awaken.
- Frank Herbert.
At 7am still at TB-36
"Man invented language to satisfy his deep need to complain" Lily Tomlin
Instrument teams - no powerups imminent
Sunday, November 2, 2008
TB-36 Cold Survival Balance continues
"We’re waiting for Godot.", Samuel Beckett
"The secret of life is enjoying the passage of time", James Taylor
"Man, if she don't get here soon, I'm going to have to wait some more", Cheech Marin
TB-36: Waiting for Cold Survival Balance
“All human wisdom is summed up in two words - wait and hope”
TB-35 is here to stay
TB-35 Still going and going and going
“A yawn may not be polite, but at least it is an honest opinion”