This blog follows the progress of the LRO mission through Integration and Testing at NASA's Goddard Space Flight Center and launch site processing at KSC\Astrotech. Its purpose is to enable communication to the entire LRO Team about the status of ongoing activities.
LRO was launched June 18th, 2009 at 5:32pm EDT from KSC. This BLOG will follow the progress of the mission as LRO travels to the Moon and establishes orbit around it.
This BLOG will be periodically updated during LRO's early mission but as the nominal mission unfolds the official NASA LRO website and the LRO Science Instrument's own websites will evolve into a more interesting sources of LRO science results as postings appear there first and LRO engineering and operations (source of this site) will become increasingly routine.
LRO was launched June 18th, 2009 at 5:32pm EDT from KSC. This BLOG will follow the progress of the mission as LRO travels to the Moon and establishes orbit around it.
This BLOG will be periodically updated during LRO's early mission but as the nominal mission unfolds the official NASA LRO website and the LRO Science Instrument's own websites will evolve into a more interesting sources of LRO science results as postings appear there first and LRO engineering and operations (source of this site) will become increasingly routine.
Monday, February 23, 2009
LRO performs final Pre-launch LAMP End to End Test
This evening, 2/23/2009, The I&T team, with the support of the LAMP engineering team, performed LAMP the instrument pre-launch end to end test. This is the final verification of instrument performance, and the final chance to verify detector health.
Sunday, February 22, 2009
LRO Sunday Update
Today was spent with the LRO MOT operating the Orbiter from the MOC at GSFC as we tested Flight Procs. We are making excellent progress and expect to wrap this up over the next week as the coming week's schedule has a number of additional shifts devoted to this.
Also today the LAMP team started their GSE ion vacuum pumps in preperation for their end-to-end test tomorrow night. It is pumping down nicely.
More news on Monday...
aequam memento rebus in arduis servare mentem
Also today the LAMP team started their GSE ion vacuum pumps in preperation for their end-to-end test tomorrow night. It is pumping down nicely.
More news on Monday...
aequam memento rebus in arduis servare mentem
Saturday, February 21, 2009
LRO Progress
Today we completed the LEND Functional with the radioactive source. Yesterday the modifications to the thermistor circuit were successfully completed to eliminate the 5 Hz interference problem. Kudos to the electrical and thermal blanket team for developing and implementing an optimal solution to this small but significant problem. The testing today showed LEND is healthy and further confirmed the 5 HZ noise is gone. The LAMP Functional was also completed after the installation of the LAMP vacuum pumping system. LAMP too is flight ready. Tomorrow flight procs will be run and checked out by the MOC at GSFC on the Orbiter here at Astrotech. The MOT is pressing hard toward FORR and tomorrows work will us bring near completion of flight proc checkouts.
Friday, February 20, 2009
Another Sim Successfully Completed
LRO Early Mission Simulation
Wednesday, February 18, 2009
News for 2-18-09
Completed Orbiter Functional late last night. Everything went exceptionally well. Today we are supporting MOC procedure checkout. We are all giddy with anticipation for the Payload Integrated Functional later tonight.
Tuesday, February 17, 2009
LRO runs the Orbiter Functional Test at KSC 0n 2/17/2009
Preprations for the Orbiter Functional Test began at 7:00 AM today 2/17/2009. As of 4:30 PM, 2/17/2009, we have completed almost 9 hours of the test and are on track to complete the Functional just after midnight tonight.
Monday, February 16, 2009
LRO Status 2/16/2009
The Orbiter was configured for the Orbiter Functional Test scheduled for tomorrow beginning at 7am. We will shortly fire the SAS NEAs, perform the HGAS Pop&Catch, walk HGAS down and reinstall the HGA Hat-Coupler, and configure the GDS. This will complete the preparations for tomorrow.
The link (click the title) with this posting will take you to a KSC page that inlcudes video feed from Astrotech where LRO is.
The link (click the title) with this posting will take you to a KSC page that inlcudes video feed from Astrotech where LRO is.
Subscribe to:
Posts (Atom)

