This blog follows the progress of the LRO mission through Integration and Testing at NASA's Goddard Space Flight Center and launch site processing at KSC\Astrotech. Its purpose is to enable communication to the entire LRO Team about the status of ongoing activities.
LRO was launched June 18th, 2009 at 5:32pm EDT from KSC. This BLOG will follow the progress of the mission as LRO travels to the Moon and establishes orbit around it.
This BLOG will be periodically updated during LRO's early mission but as the nominal mission unfolds the official NASA LRO website and the LRO Science Instrument's own websites will evolve into a more interesting sources of LRO science results as postings appear there first and LRO engineering and operations (source of this site) will become increasingly routine.
LRO was launched June 18th, 2009 at 5:32pm EDT from KSC. This BLOG will follow the progress of the mission as LRO travels to the Moon and establishes orbit around it.
This BLOG will be periodically updated during LRO's early mission but as the nominal mission unfolds the official NASA LRO website and the LRO Science Instrument's own websites will evolve into a more interesting sources of LRO science results as postings appear there first and LRO engineering and operations (source of this site) will become increasingly routine.
Monday, June 22, 2009
Successful LOI-E Burn!!
We have just successfully completed our Lunar Orbit Insertion Engineering (LOI-E) burn!! All systems continue to perform nominally. Preparations continue for our LOI-1 burn.
LRO Launch from the LRO MOC at GSFC
The LRO Mission Operations Team at the LRO Mission Operations Center (MOC) at Goddard Space Flight Center watching LRO's launch and taking over operations of the LRO Spacecraft as it begins its journey to the moon.
LRO Update
LRO has slowed to a crawl relative to the earth (245 m/s,547 mph) and it at essentially lunar distance (352000km,219000mi) When the moon catches up to us early tomorrow morning we'll execute our LOI-1 burn to capture into our initial orbit.
A note to those leaving comments: This BLOG is updated by the LRO Project Manager and his Deputy at this point. Unfortunately neither of us have time to moderate and reply/respond/post the comments. I do read them as they flow through my inbox but for now that is as far as they go. Sorry.
A note to those leaving comments: This BLOG is updated by the LRO Project Manager and his Deputy at this point. Unfortunately neither of us have time to moderate and reply/respond/post the comments. I do read them as they flow through my inbox but for now that is as far as they go. Sorry.
LRO Status & Upcoming Events
The preliminary work leading to our LOI has begun. All spacecraft systems are healthy. Below is a timeline of key upcoming events:
6/22 10:33pm EDT - Final LOI Maneuver Plan Generation & Verification
6/22 11:05pm EDT - LOI-E (Engineering Burn ~30sec)
6/23 1:05am EDT - Load LOI-1 Maneuver Tables
6/23 4:00am EDT - Shift Handover Briefing
6/23 4:47am EDT - Pre-LOI-1 Configuration Verification Begins
6/23 5:47am EDT - LOI-1 Burn Begins
6/23 6:27am EDT - LOI-1 Burn Complete, LRO in lunar orbit
6/23-6/27 - LOI-2 thru LOI-5 burns, approximately one per day.
6/27 - 30x216km commissioning polar orbit established
6/22 10:33pm EDT - Final LOI Maneuver Plan Generation & Verification
6/22 11:05pm EDT - LOI-E (Engineering Burn ~30sec)
6/23 1:05am EDT - Load LOI-1 Maneuver Tables
6/23 4:00am EDT - Shift Handover Briefing
6/23 4:47am EDT - Pre-LOI-1 Configuration Verification Begins
6/23 5:47am EDT - LOI-1 Burn Begins
6/23 6:27am EDT - LOI-1 Burn Complete, LRO in lunar orbit
6/23-6/27 - LOI-2 thru LOI-5 burns, approximately one per day.
6/27 - 30x216km commissioning polar orbit established
B-I-G (Boring is Good)
Our new motto: B.I.G. "Boring is Good"....things continue to go smoothly as LRO cruises towards the moon. LRO is now 339, 838 km from the Earth. We are getting ready for the Lunar Orbit Insertion Engineering (LOI-E) burn which will occur in approximately 23 hours. We are also preparing for the LOI-1 burn which will occur in approximately 29 hours.
White Sands 1 (WS1) has successfully supported S and Ka-Band support for our mission. This is a great milestone with our new ground station enabling clean data transfer from the LRO spacecraft to the MOC at 100 Mbps. Also, solid commanding capability to our spacecraft as it cruises to the moon.
CRaTER, the 1st instrument to be turned on, is reporting good, solid data and has produced their 1st LET spectrum in all 6 detectors from the 1st 10 minutes of data received. LEND is now in their optimal configuration for LOI burns.
White Sands 1 (WS1) has successfully supported S and Ka-Band support for our mission. This is a great milestone with our new ground station enabling clean data transfer from the LRO spacecraft to the MOC at 100 Mbps. Also, solid commanding capability to our spacecraft as it cruises to the moon.
CRaTER, the 1st instrument to be turned on, is reporting good, solid data and has produced their 1st LET spectrum in all 6 detectors from the 1st 10 minutes of data received. LEND is now in their optimal configuration for LOI burns.
Sunday, June 21, 2009
LRO Status 6/21/200 10:17am EDT
A calm and boring day thus far (this is good). Gyro mini-cal was completed. Another notable that actually occurred last night was a successful Ka-band file download to WS-1 at 100 Mbps! We are almost at lunar distance and have not yet even calibrated the High Gain Antenna System yet, an activity planned during spacecraft commissioning.
LRO Location
Quiet Shift & Happy Father's Day!
LRO continues to cruise happily towards the moon. As of 07:30 GMT (3:30 EDT), LRO is 302, 978 km from the Earth.
It was a quiet shift for us, we continue LEND calibration configurations and station handover activities.
It was a quiet shift for us, we continue LEND calibration configurations and station handover activities.
Subscribe to:
Posts (Atom)
